Techint E&C
Techint E&C, South East Gateway Project · 18 min
The building of the South East Gateway Project, which will carry gas from Veracruz to the south of Mexico, told by the people on site.

- Client
- Techint E&C
- Format
- Documentary
- Year
- 2026
- Length
- 18 min
- Place
- Veracruz
Watch
Credits
- Client
- Techint E&C (Mexico)
- Script
- Santi Boyero
- Direction
- Santi Boyero
- Production
- Ahorita Films, Ximena Rincón, Isa Lorente
- Cinematography
- Belén Guzmán, Santi Boyero
- Camera assistant
- Irving Olivera
- Drone
- Iván García
- Sound
- Miguel Sánchez
- Data management
- Adán Díaz
- Editing, colour and sound design
- Santi Boyero
- Motion graphics
- Gastón Allario
- Transport
- Juan Manuel Vázquez “Moroco”
Notes
Alongside Santi Boyero’s own shoot with a crew in Tuxpan, the full film brings together almost three years of images recorded by many hands, phase by phase, as the construction moved forward.